22+ Homes In Castle Pines
Castle Pines
68+ Homes In Peregrine
Peregrine
68+ Homes In Highlands Ranch
Highlands Ranch
135+ Homes In Wagon Trails
Wagon Trails
310+ Homes and Condominiums In Boulder
Boulder
230+ Homes In Briargate
Briargate
780+ Homes and Apartments In Westminster
Westminster
27+ Homes In Cherry Hills
Cherry Hills
368+ Homes and Apartments In Mountain Shadows/Rockrimmon
Mountain Shadows/Rockrimmon
44+ Homes In Pinecrest
Pinecrest
110+ Homes In Thornton
Thornton
114+ Homes In Widefield
Widefield
114+ Homes In Crystal Park
Crystal Park
16+ Homes In Telluride
Telluride
120+ Homes In Evergreen
Evergreen
2,080+ Homes and Apartments In Jefferson County
Jefferson County
Replumbed 17 units per building across 4 buildings. Replumbed each mechanical room, installed new mains to each unit, rebuilt unit manifold systems, and upgraded existing plastic panels to 1-hour fire-rated panels.
Buffalo Ridge Apartments
Abatement implementation. Pitted potable copper mainline and distribution line replacement and tub and shower valve upgrades. Washer and dryer installs permitted, water heaters updated.
Ski Inn Condominiums
Failed epoxy-lined pitted copper replacement. Included boiler and sidearm piping, domestic hot and cold water distribution lines, hot water recirculation, new tub and shower valves. 456 units in 24 buildings.
Waterfront Apartments
Hot and cold polybutylene replacement in 45 common wall condominiums. Tub and shower valve upgrades. All fire-rated party walls repairs permitted and completed. Project ongoing.
Promontory Pointe Condominiums
Complete replacement of potable hot and cold piping for 260 units, including replacement of tub and shower valves, main shutoff valves, and installation of expansion tanks.
Park at Canyon Ridge Apartments
Complete replacement of potable and hot water recirculation lines throughout 25 units across 6 buildings. Installation of new balancing valves and in-unit main shutoffs.
Dulany Condominiums
Complete replacement of potable and hot water recirculation lines throughout 104 units, kitchen, common areas, maintenance rooms, bathrooms, and the laundry facility. Installation of new balancing valves and in-unit main shutoffs.
Park Regency Assisted Living
Complete replacement of hot and cold potable copper piping in 240 units.
Eagle Ridge Apartments
Complete replacement of hot and cold potable piping, and hydronic baseboard heat distribution lines in 14 units.
Meredith Condominiums
Commercial building and plumbing permitting for full potable hot and cold water replacement. Ongoing.
Autumn Heights Townhomes
Replacement of the vertical and horizontal cast iron waste and vent systems in 104 apartment units. Additionally, redesigning and implementing hot and cold potable water systems, as well as recirculation systems, for both commercial and residential spaces.
Decatur Place Apartments
Complete replacement of potable hot and cold water lines, including recirculation lines, along with the addition of in-unit main shutoffs.
Fish Creek Falls Condominiums
Complete replacement of hot and cold potable piping, tub and shower valves, main shutoffs, and installation of expansion tanks for 242 apartment units.
Highland Point Apartments
Complete replacement of hot and cold potable piping, along with replacing tub and shower valves, main shutoffs, and installing expansion tanks in 120 units.
Silver Reef Apartments
Complete replacement of horizontal cast iron and ABS waste lines, as well as the replacement of hot and cold potable lines.
Vail Das Schone Condominiums
Boiler replacement.
Villa Maria Apartments
Complete replacement of hot and cold potable piping, tub and shower valves, main shutoffs, and installation of expansion tanks for 132 units.
Valley Park Apartments
Complete replacement of mainline infrastructure and potable hot and cold piping for 33 condominium units.
Ptarmigan House Condominiums
14 condominium units. Complete replacement of hot and cold potable water lines, hydronic baseboard heat distribution lines, and central hydronic heat piping and return loop lines. Complete replacement of hot and cold potable and recirculation lines.
Greenwich Condominiums
Commercial building and plumbing permitting, along with engineering plan reviews. Full replacement of hot and cold potable lines. Ongoing.
Piñon Sun Condominiums
Complete replacement of main water distribution, as well as the replacement of hot and cold potable lines and bringing water heaters to code. 20 condominium units.
The Meadows Condominiums
Replacement of hot and cold potable mainline distribution and recirculation lines, hydronic hot water heat pipe distribution loop and low voltage rewiring. 2 towers consisting of 24 and 16 stories, totaling 388 units.
Francis Heights Apartments
96 units. Replacement of hydronic heat piping, boilers, and hot water storage. Condenser and fan coil for heating and air-conditioning, new exterior condensers, hot and cold potable and recirculation lines, underground main service lines.
Holly Park Apartments
Complete replacement of hot and cold potable piping, as well as tub and shower valve replacements and main shutoff replacements. 224 units.
Skyview Apartments
Pipe Replacement Solutions For Any Situation
From Apartments And Assisted Living Communities, To Condominiums And Hotels.
words from our clients
“Working in the multifamily world, the impact a project like a Replumb can have on a community cannot be understated. Replumb Specialties, on more than one occasion, has turned what could have been a nightmare experience into a show on how professionalism and caring can impact a project of this nature…”
Derek Viosca
RCM | ColRich
Revolutionizing pipe replacement, together.